2014-2018
Bergteamet AB
Long-term project for drilling ventilation shafts 2 m in diameter
Setting of the drilling rig for extraction drilling, checking the geometry
2014-2018
Styrud Arctic
Long-term project for drilling energy and water distribution systems
Setting of the drilling rig, checking the geometry, survey documentation. During the project, drilling in the total length of 28000 m was set.
2017-2018
Bergteamet AB
Project for the extension of the mine and the subsurface transport paths
Drilling navigation of the tunnels, point field, as-built documentation
2015-2019
ÅF Consult, Gisab
Renovation of the LKAB mining shafts
Documentation of the current state before the renovation, point field, setting out work for fitting with steel structures, quality inspection
2015-2016
Teodoliten Mätteknik AB
Construction of the Mall of Scandinavia business centre in Stockholm
Setting out and checking geometric accuracy
2017-2018
ÅF Consult, New Boliden
Renovation of a mining shaft
Geodetic network, plumbing and depth measurement, documentation of the current state
2016-2019
Subterra / SBT Sverige AB
Förbifart tunnel bypass / Skärholmen / Stockholm
Development of digital data for survey management of the structure, navigation support, 3D documentation of the lining, underbreak and overbreak analysis, geotechnical monitoring
2016-2019
Teodoliten Mätteknik AB
Construction of a linear particle accelerator
Setting out and quality inspection. Project website: https://europeanspallationsource.se/
2016
Marsalis Bygg Sverige AB
Construction of a primary crusher for processing iron ore
Setting out, installation of steel structures and machinery, quality inspection
2018
Skarta AB
Construction of technological equipment for the processing of multi-metallic ore
Setting out, installation of steel structures and machinery, adjustment of crane runways, quality inspection
2015-2019
ÅF Consult, GISAB
Installation of machinery as part of the renovation of mining machinery
Accurate setting out and checking the geometry
2016
BDX
Renovation and widening of the E10 road in the Svappavaara-Mertainen section
Setting out, preparing documentation and calculation of the mass during the implementation of the earthworks and laying layers of the roadway
2015-2017
NCC
Opening of a new minie level in the LKAB Kiruna iron ore mine
Drilling navigation, secondary point field, as-built documentation, geotechnical monitoring
2018
Bergteamet AB
Construction of traffic tunnels in the Renströms and Kristineberg mines
Drilling navigation for the tunnels, point field, as-built documentation, mass analysis
2016-2018
LKAB
Support for short-term planning of mining / Leveäniemi open-pit mine
Short-term planning of mining in cooperation with the department of geology, management and monitoring of quality of primary processing of the mined rock
2015
NCC
Construction of snow barriers on the Kiruna-Narvik railway
Setting out, check measurement, and as-built documentation
2015
NCC
Construction of a kindergarden in Bergkristallen, Kiruna
Setting out, check measurement, and as-built documentation